Fixing a Flip: Deck remodel with cable railing system how-to
Video by MyFixitUpLife home improvement pros Mark & Theresa · 1 moment used in Oak Valley Designs's DIY guides · 7:38 long

Moments in this video
- 3:19–4:10 Thread Cable Railing
From Cable Railing Installation, Step 8: Thread Cables Through Posts
With all posts installed, it's time to thread the stainless steel cables through the pre-drilled holes in the posts. Each cable has two distinct ends: one is a flat end designed to thread onto the cable railing, and the other has a small raised center. The raised center end will go on the opposite side of the railing, ready for tensioning. Carefully feed each cable through the posts, ensuring it runs smoothly and without kinks. This step prepares the railing for the crucial tensioning process.
The guide that use this video
More from the Oak Valley Designs DIY Hub
Read the guide Browse all guides
Planning this project? Shop Oak Valley Designs.

