EXTERIOR STAIR RAILING w/ METAL DECK GATE
Video by BYOT · 1 moment used in Oak Valley Designs's DIY guides · 14:11 long

Moments in this video
- 7:35–7:53 Finish with End Caps and Sticker Removal
From How to Install a Handrail on Outdoor Concrete Steps, Step 7: Install End Caps or Returns (if applicable)
Remove any remaining product stickers from the handrail using a sticker remover like 'Goof Off'. Then, install plastic end caps onto both ends of the handrail to provide a finished look and protect against sharp edges. Similarly, secure the matching end caps to the bottom of each railing post, tapping them gently into place with a rubber mallet if needed. These caps enhance aesthetics and protect the posts.
The guide that use this video
Transcript
0:04 why hello there brent here with bring your own tools on today's episode if you want to learn how to install your very own custom gate as well as an exterior handrail for your steps keep watching let it started [Music] in a previous video we installed these beautiful exterior steps however after discussing it with the client we really did realize that we wanted to enclose the front as well as put on a railing on the side of these steps because they are four feet tall and therefore we don't want anyone falling down so might as well install a beautiful railing by
0:51 viewrail of course and for our railing we are using viewrail's signature rod railing system it's very similar to the system that we installed on the deck but this one does have a few very unique things to it in order for these rods to fit perfectly for a slanted angle the first step of course is to start with the first step yeah that was kind of a dead joke the positioning on this first top step is very key because this position is going to be correlated to the other areas in which you're going to put the post i make a mark at three and five inches because that's where our bracket is going to be placed as well as an inch and a half down from our top tread which correlates to the height of our bracket plate after pre-drilling my holes for the through bolts i do quickly realize that
1:37 i should put some type of backing in these positions which i secure nicely with a couple screws then re-drill my holes and install the first plate this is their standard side mounted bracket system which all you have to do is take your through bolt put one of the plastic washers on first then slide it into the bracket and then slide it right into the hole you do this three times on the front and then on the back side you install one of the stainless steel washers as well as a stainless steel nut i secure the center bolt first then double checking my levelness and if it's level i fully secure the middle bolt as well as the top bolt the third bolt you keep loose because we'll get to that one shortly once we have the top bracket in place i
2:22 proceed to the bottom step taking on the same exact procedure positioning drilling securing and moving on to our third bracket keep in mind that we have seven steps on this project so if we subtract the two that we already installed that leaves us five steps and i'm going to be securing our third post to the dead center which is the fourth step whether you're coming from the top or bottom as you can see might be a little bit better if i give you the full picture these posts are all the exact same so they're very easy to slide into place might just need a couple love taps in certain respects but once you have them on all you have to do is take your ratchet wrench and tighten down that third bottom bolt in order to fully secure all three posts however on the
3:09 bottom post that actually doesn't come into play because it's so close to the ground and we have a concrete slab so we can't actually dig underneath we make a mark where the fastener needs to be located then i take my step drill and drill the appropriate size hole for this fastener once we have our hole taken care of i slide the post back on then secure it with our large screw that also comes with the kit the one really nice thing about these posts is that it takes into account the fact that all steps seemingly are slightly different depending on the rise versus run that you have on your project which is why when you order your system you have to give viewrail their measuring rise versus run guide in order to determine the exact degree that those holes that need to be drilled within the
3:56 tube itself there's an adjustable bracket that goes on the top of each post that i secure with one screw slightly loose and then i actually tape those brackets in place based upon where i place the railing now i do determine the exact length that i want on one side but this railing does come a little bit long so i will have to cut down one side to the appropriate length i fully remove the railing top cap and then position all the appropriate nuts into the side of the slot once all those are slid into place i then position them exactly where they need to be placed and then secure them with the appropriate screw heads each one of these brackets gets two of these screw heads and the nice thing is now that they're taped i know the exact locations of where each
4:42 one needs to go once i have all three brackets fully secured i then cut the railing down to the appropriate length and install with ease because each bracket is in its perfect location each bracket has two fasteners one on each side and after all those are fully secured i double check the levelness of each post which is perfect and we can proceed to our rods these are quarter inch stainless steel rods which match the exact same style that we have on our deck now the only thing that's really different between this system and the deck is how we actually attach them to our posts in order to determine the appropriate length i feed it through the system and then insert their threaded crimp fitting but i don't crimp it at this point
5:28 because i'm just going to determine the exact length that i need first on this first rod assembly i insert an angle washer as well as a level tension receiver and slide this tension receiver at the appropriate location then i go to the very bottom post and make a mark where this post is located on the rod itself then i can determine the exact length that is needed for every single length which in all honesty turns out to be a perfect 75 inches now that we have the rod at the correct length i do suggest using the burring tool to make sure that the hole is nice and cleaned out before we insert our threaded crimp fitting once we actually have that inserted we then crimp it
6:14 using the appropriate crimping tool and do that to both sides once we have that taken care of we can bring it back to our railing insert it into each individual post making sure it cleanly and smoothly goes down from post to post to post it might need a little adjustment here and there but as you can see it's at the correct and appropriate length because of all that hard work we did prior to this point now it's easy because all you have to do is insert a second angled washer as well as a tension receiver on the end while tightening down with an allen wrench as long as that fits perfectly guess what we can move on to all the other rods as for cutting the standstill rods i'm
7:01 using a standard angle grinder with a metal cutting blade and after they're all cut you could use a deburrer or you could just use a standard cobalt drill bit and that works just fine as well as long as you have the right size go ahead and crimp all the ends and insert them into their appropriate locations because they're all the same length this came together extremely quickly and easily and the nice thing is is that because we had the appropriate post locations the angle from post to post posts was absolutely perfect the only other thing that needs to be done for a step railing is to remove any of the stickers that are shown which can be easily removed with some goof off and secure our end caps on both ends of our
7:46 handrail as well as the bottom of each post so we obviously had our beautiful railing from v-rail earlier this year but we have a large opening here so we decided to actually bring in a gate and they have and customize gates specifically for your space now that we know our space we had the gate fabricated to its exact dimensions now we just need to get it installed let's get to it in order to have a large gate like this that's fully supported for years to come you have to have a heavy duty post and in all honesty aluminum just wouldn't cut it for this type of installation
8:33 which is why we have a very heavy duty steel post at this location it also comes from view rail just it's made out of steel versus aluminum and we actually don't have a bracket mounting system in this specific location because in order to have the most strength possible we have to secure this post directly to our deck as you have seen i pre-drilled both of my holes and then secured a very long very large lag screw into each specified hole and once i know for certain that we're level i can install our stainless steel caps for the holes that we have in the post and proceed to our gate this gate system is also slightly
9:18 different than our rod railing for our deck and that's because of this little guy right here this is a level rod anchor and this is also the level rod anchor install tool and all i have to do is pound that threaded insert first into the post not going all the way in and then using the rod tool to secure it into the tube itself then once it's actually tightened there you can then thread your stainless steel rod into the hole and secure it nicely from there once you have it fully fastened at this location you then go back to where you actually threaded it through insert your level tension receiver and tighten that down because once that's tightened then each rod is fully stable
10:04 and you can move on to the next one the nice thing about this gate is that v-rail pre-measures and crimps the rods to the appropriate length so you don't have to which is one less step that i don't have to worry about which is always appreciated now a huge thank you does have to go out to v-rail again because they are the sponsor of this week's video and they provided all of this amazing product and materials for this entire project so if you want to check out their amazing lineup for yourself i'll make sure and leave a link in the description box below but getting back to the project now that we have all of our rods secured within the gate it's now time for hinges in four hinges we are using true close hinges which are some heavy duty hinges
10:50 that came with this kit for a gate this size you really do want a substantial hinge and these guys are quite substantial and they have a spring hinge which means that if you open the gate it will spring back into the closed position so you don't have to worry about trying to maneuver it in place after you open it it should swing perfectly back in place now the screws that come with this kit are sheet metal screws so you can drill into each frame as needed however it would probably be a little bit easier if you pre-drilled your holes first and then secured your hinge now that we have our gate secured to our post we have to do our final finishing touches which are brackets at the very top of the gate as well as the end post
11:38 because we want to still install our drinker rail this drinker rail matches the same drink rail that we installed in our deck railing video and for this little small section at the very end all i had to do is cut it to the correct length then put the end cap right on top secure it to the post with a couple screws on the underside then install the end cover cap make sure that fits nicely and snugly make sure our posts are still level and as long as those posts are still level then secure that cover cap to our drinker reel and move on to our final drinker rail section which is the section right above our gate because we do want to have a continuous top cap all the way around our deck once you
12:24 determine the exact placement on our gate i do take a sharpie and mark out a couple lines on where the brackets need to be placed then i remove those two brackets and use my line templates as a template for those brackets as to where they need to be placed which makes determining those exact locations extremely easy to figure out once they're secure then go ahead and reinstall them on top of your gate and once it's reinstalled we can move on to the final step of this entire project which is our latch system to have a latch on this amazing railing system it's got to be quality as well as good looking and this is a magnetized latch which means that as you open the gate and it swings close it automatically catches because it's magnetized and all
13:11 you have to do for the installation portion is to determine the location pre-redrill your holes insert your fasteners and guess what we are done [Music] something about a system that not only provides a beautiful aesthetic but it also provides a tremendous amount of safety for anyone no matter what your age is i personally want to say a huge and special thank you again to view rail for sponsoring this week's video by providing all the materials that you see here for the railing it's absolutely beautiful and truly makes this project a
13:58 standout deck it's beautiful it's supportive and one project that i can be proud to say is one beautiful sexy beast oh yeah
Automatically transcribed from the source video.
More from the Oak Valley Designs DIY Hub
Read the guide Browse all guides
Planning this project? Shop Oak Valley Designs.

