DIY Gas Fire Pit Table
Video by MrFixItDIY · 1 moment used in Oak Valley Designs's DIY guides · 7:43 long

Moments in this video
- 1:30–1:40 Add Wire Mesh Reinforcement
From How to Pour a Concrete Landing Pad for Deck Stairs, Step 4: Place Rebar or Wire Mesh
To reinforce the concrete top, cut and place wire mesh inside the assembled form. Use an angle grinder to precisely cut the wire mesh to fit within the boundaries of the form and around the central cutout. Position the mesh so it will be embedded within the concrete, typically about one-third to halfway up from the bottom of the pour. This reinforcement helps prevent cracking and increases the overall strength of the concrete.
The guide that use this video
More from the Oak Valley Designs DIY Hub
Read the guide Browse all guides
Planning this project? Shop Oak Valley Designs.

