  1. 0:57–0:59 Cure Concrete and Remove Forms From How to Pour a Concrete Landing Pad for Deck Stairs, Step 9: Cure the Concrete

    Proper curing is essential for the strength and durability of the concrete. Keep the newly poured concrete moist for at least 7 days (and preferably longer, up to 28 days for full strength) by regularly misting it with water, covering it with plastic sheeting, or using a curing compound. This prevents rapid drying and cracking. Once the concrete has sufficiently hardened (typically after 24-48 hours, but check local guidelines and concrete type), carefully remove the forms. You can gently tap the forms with a hammer to loosen them before prying them away. After form removal, the concrete will continue to gain strength during the remainder of the curing period.

The guide that use this video

More from the Oak Valley Designs DIY Hub

Read the guide Browse all guides

Planning this project? Shop Oak Valley Designs.

#CONCRETE #CONCRETEWork #concretelife #construction — step-by-step moments | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.