From Concrete Step Repair · Step 5 of 5 · Video by The Handy Neighbor

Showing 2:12–2:46 of the source video.
Approximately 15-20 minutes after application, when the patch has started to dry but is still workable, dampen a sponge and squeeze out most of the excess water. Use the damp sponge to gently 'polish' and further smooth out the patched area. This can help blend the repair with the existing concrete texture. After this final smoothing, avoid driving over the repaired area on the same day. Allow the patch to dry and cure for 6-8 hours before putting any weight or traffic on it.
Goal: Achieve final smooth finish and allow proper curing
This project details the process of repairing chipped concrete driveways, common in areas with harsh winters. It covers material selection, thorough surface preparation using a pressure washer and wire brush, proper mixing and application of a vinyl concrete patching compound, and final smoothing for a durable repair.
Once finished, the patched area needs to cure properly to achieve its maximum strength. Keep foot traffic and other loads off the repaired step for at least 24-48 hours, or as specified by the patching compound manufacturer. Protect the patch from direct sunlight, extreme heat, freezing temperatures, and heavy rain during the curing period. Lightly misting the patch with water periodically for the first 24-72 hours can aid in curing, especially in hot, dry conditions (follow product instructions).
This project outlines the process for repairing cracked or chipped concrete steps using a suitable patching compound. The steps involve cleaning the damaged area, preparing it for repair, applying the patching material, and finishing the surface to match the surrounding concrete.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.