Manage Long-Lead Procurement

From How to Plan a Stair Remodel Budget and Sequence · Step 6 of 10 · Video by Jason Schroeder

Showing 0:40–2:58 of the source video. Watch the full video with every moment.

What happens in this clip

It is critical to identify and initiate the procurement process for any materials or equipment that have extended delivery times. Examples include switchgear, air handlers, curtain wall systems, specialized tiles (e.g., from Italy), and elevators. These items must be secured and scheduled for delivery before their respective construction activities commence. This pre-planning, often occurring three months before the actual project start, is facilitated by using macro-level and norm-level takt plans (master schedules) to 'trigger' the buyout process when necessary, ensuring components are on-site precisely when installation is due.

Goal: Actively manage the procurement of all long-lead items well in advance of the project start date to prevent delays. This involves working backward from the production plan to initiate buyouts and purchasing processes.

What's used

Tools

  • Marker
  • Whiteboard

Materials

  • Long-lead procurement items (e.g.
  • switchgear
  • air handlers
  • curtain walls
  • specialized tiles
  • elevators)

About the full video

This video provides essential strategies and considerations for effectively managing the initial phases of a construction project. It outlines critical pre-construction activities such as long-lead item procurement, establishing temporary utilities, conducting thorough site surveys, sequencing work for rapid mobilization, setting up the project team, and the comprehensive trade partner preparation process. The goal is to ensure a fast, efficient, and well-coordinated start to any construction endeavor, minimizing risks and maximizing productivity from day one.

What's said in this clip

going to have some fun okay so first and foremost let's say that this right here is your start date on your project you really want to get these first mobilization foundations excavation these activities like really going well and you want to come out of the gate really hitting it hard really going fast now you know me I'm not a p sure I'm a driver but if we want to drive 80 M an hour at the beginning of the project is the time to do it later on in the project when you have 40 different trade Partners it's hard to speed up or slow down without massive consequences but when you have a couple of Trades here at the beginning we must get out of the gate fast so what I want to say is about 3 months before you start the actual project we had better be to a spot where the builders are involved and we have our macro level T plan which means our master schedule and our Norm level tack plan we'd better be looking at long lead procurement right so before we start if you have Shoring if you have post tension systems if you have complex reinforcing types if you have anything that you need to start this building you better have managed the long lead procurement before we come to that stage so that's why I love preconstruction efforts is because you can go ahead and get deferred submittals for the post tension out you can get your detailing for your concrete structure going you can get your showing systems designed and get those shop drawings going through and get them approved right anything that you need here needs to be done in preconstruction so one of the first things that we need to look at is procurement right do we have long lead procurement items coming on the way for the things that we need so let's check it out obviously you're going to have switch gear obviously you're going to have air handlers if you have curtain wall on your project unitized curtain wall on your project you're going to have to get that out if you have tile from Italy anything that's long lead elevators needs to be taken care of in preconstruction and the way that I like to do this is if you have a macro or Norm level tack plan meaning your production plan you work those back and you trigger those you start the buy out in the procurement process when it's needed so you can start right here so if you want to know how to really manage a construction project early on make sure that you're managing procurement in a remarkable way the other thing that I

Automatically transcribed from the source video.

Step 6 of 10: Plan for Material Procurement and Delivery

Based on the remodel scope and budget, create a list of all materials needed. Research suppliers, compare prices, and place orders well in advance, especially for custom-ordered items. Coordinate delivery dates to align with the project schedule.

Open this step in the guide

Every video in How to Plan a Stair Remodel Budget and Sequence

  1. Step 1: Assess Existing Staircase Condition

  2. Step 2: Determine Remodel Scope and Design

  3. Step 3: Create a Detailed Budget

  4. Step 4: Obtain Necessary Permits

  5. Step 5: Sequence Demolition and Preparation Tasks

  6. Step 6: Plan for Material Procurement and Delivery

  7. Step 7: Sequence Installation Tasks

  8. Step 8: Plan Finishing and Sealing Steps

  9. Step 9: Schedule Inspections

  10. Step 10: Develop a Clean-up and Waste Disposal Plan

Questions about How to Plan a Stair Remodel Budget and Sequence

The project says 'Estimated time: 2 minutes'. Does that mean the entire stair remodel will only take two minutes?

No, the '2 minutes' refers to the time it takes to complete the *planning* steps outlined in this guide. The actual stair remodel project itself will take significantly longer, often days or even weeks, depending on the scope, materials, and whether you're hiring professionals or doing it yourself.

What are the biggest cost factors to consider when budgeting for a stair remodel?

The main cost factors typically include materials (wood, balusters, treads, risers, railing), labor costs if hiring contractors, and potential structural modifications if your design changes the stair layout. Don't forget to budget for disposal fees, permits, and a contingency fund for unexpected issues.

What's a common mistake beginners make during the planning phase of a stair remodel?

A common mistake is underestimating the complexity and potential hidden issues, like water damage or structural problems behind existing finishes. Another is failing to account for the impact on surrounding flooring or walls, which might also need repair or finishing after the stairs are done. Always add a contingency to your budget for unforeseen problems.

Why is establishing a logical sequence of tasks so important for a successful stair remodel?

A well-planned sequence prevents rework, saves time, and reduces frustration. For example, planning demolition before ordering new materials ensures you know exactly what you're dealing with. Sequencing also helps coordinate contractors, material deliveries, and ensures critical steps like structural work are completed before cosmetic finishes.

The listed tools seem basic. Do I need more specialized tools just for the planning stage?

The tools listed, like a measuring tape and calculator, are primarily for the *planning* and *assessment* phase of your project. For the actual demolition, construction, and finishing of the stairs, you will indeed need a much wider array of tools, such as saws, drills, sanders, and safety gear. This planning guide helps you prepare for those needs.

What safety considerations should I keep in mind even during the planning stages of a stair remodel?

During planning, consider how to maintain safe access if stairs are out of commission and how to safely dispose of demolition debris. Also, factor in personal protective equipment (PPE) for the actual work, like gloves, eye protection, and dust masks. If you suspect structural issues, plan to consult a professional engineer.

How to Plan a Stair Remodel Budget and Sequence

Develop a comprehensive plan for a stair remodel, including budget allocation for materials and labor, and establishing a logical sequence of tasks from demolition to finishing touches.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Manage Long-Lead Procurement — How to Plan a Stair Remodel Budget and Sequence | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.