Install Risers and Treads

From How to Plan a Stair Remodel Budget and Sequence · Step 7 of 10 · Video by Perkins Builder Brothers

Showing 15:24–19:11 of the source video. Watch the full video with every moment.

What happens in this clip

The installation of the risers begins, securing them with both construction adhesive and finish nails to prevent any future squeaking or movement. This ensures a solid connection between the vertical riser and the structural elements. After the risers are installed, the treads are carefully fitted. A unique method is used where a single tread is cut square and used as a gauge to check the fit against the newly installed skirt boards. This allows for identifying any areas where the skirt board might need slight adjustment (e.g., adding a 1/16th or 3/32nd inch) to accommodate a perfect fit for each tread. The treads are then installed, again using construction adhesive and finish nails. This step deviates from traditional lapped joints by relying on precise cuts and strong adhesion for a flush, tight fit rather than interlocking wood joinery for primary structural support, as the structural stringers already provide that. The video notes that traditional staircases often used notches and wedges for integral strength, which this modern approach replaces with framing and finishing materials.

Goal: The yellow pine risers and treads are installed using a combination of construction adhesive and finish nails, ensuring a solid, squeak-free staircase assembly.

What's used

Tools

  • Construction Adhesive
  • Finish Nailer (Paslode)
  • Pencil

Materials

  • Finish Nails
  • Yellow Pine Risers
  • Yellow Pine Treads

About the full video

This video details the process of constructing a wooden staircase, focusing on precision fitting of risers and treads, and addressing challenges like mismatched heights. It highlights techniques for creating precise patterns for skirt boards and discusses the benefits of using a combination of adhesive and fasteners for a sturdy, squeak-free staircase. The video also touches upon the historical context of lapped joints in staircase construction versus modern methods.

What's said in this clip

that ends another day and another week at the farmhouse quite a hustle i must say yeah we got a lot done in a little time there at the end because we wanted it done that bad and a little side note what day is today in the farmhouse do you think 70 i don't know 2 72 but on this video it's gonna say 71 because we skipped filming today and ray and jay on ray j builder buddies i don't know what they did but they filmed it because i needed a break we'll see when it comes out so look on their channel if uh you want to see that thanks for building with us today let's go the house [Music] so [Music] you

Automatically transcribed from the source video.

Step 7 of 10: Sequence Installation Tasks

Outline the sequence: typically starting with structural repairs or modifications to the stringers, followed by the installation of new treads and risers, then newel posts, handrails, and finally balusters. Plan for any necessary sub-floor preparation or underlayment installation.

Open this step in the guide

Every video in How to Plan a Stair Remodel Budget and Sequence

  1. Step 1: Assess Existing Staircase Condition

  2. Step 2: Determine Remodel Scope and Design

  3. Step 3: Create a Detailed Budget

  4. Step 4: Obtain Necessary Permits

  5. Step 5: Sequence Demolition and Preparation Tasks

  6. Step 6: Plan for Material Procurement and Delivery

  7. Step 7: Sequence Installation Tasks

  8. Step 8: Plan Finishing and Sealing Steps

  9. Step 9: Schedule Inspections

  10. Step 10: Develop a Clean-up and Waste Disposal Plan

Questions about How to Plan a Stair Remodel Budget and Sequence

The project says 'Estimated time: 2 minutes'. Does that mean the entire stair remodel will only take two minutes?

No, the '2 minutes' refers to the time it takes to complete the *planning* steps outlined in this guide. The actual stair remodel project itself will take significantly longer, often days or even weeks, depending on the scope, materials, and whether you're hiring professionals or doing it yourself.

What are the biggest cost factors to consider when budgeting for a stair remodel?

The main cost factors typically include materials (wood, balusters, treads, risers, railing), labor costs if hiring contractors, and potential structural modifications if your design changes the stair layout. Don't forget to budget for disposal fees, permits, and a contingency fund for unexpected issues.

What's a common mistake beginners make during the planning phase of a stair remodel?

A common mistake is underestimating the complexity and potential hidden issues, like water damage or structural problems behind existing finishes. Another is failing to account for the impact on surrounding flooring or walls, which might also need repair or finishing after the stairs are done. Always add a contingency to your budget for unforeseen problems.

Why is establishing a logical sequence of tasks so important for a successful stair remodel?

A well-planned sequence prevents rework, saves time, and reduces frustration. For example, planning demolition before ordering new materials ensures you know exactly what you're dealing with. Sequencing also helps coordinate contractors, material deliveries, and ensures critical steps like structural work are completed before cosmetic finishes.

The listed tools seem basic. Do I need more specialized tools just for the planning stage?

The tools listed, like a measuring tape and calculator, are primarily for the *planning* and *assessment* phase of your project. For the actual demolition, construction, and finishing of the stairs, you will indeed need a much wider array of tools, such as saws, drills, sanders, and safety gear. This planning guide helps you prepare for those needs.

What safety considerations should I keep in mind even during the planning stages of a stair remodel?

During planning, consider how to maintain safe access if stairs are out of commission and how to safely dispose of demolition debris. Also, factor in personal protective equipment (PPE) for the actual work, like gloves, eye protection, and dust masks. If you suspect structural issues, plan to consult a professional engineer.

How to Plan a Stair Remodel Budget and Sequence

Develop a comprehensive plan for a stair remodel, including budget allocation for materials and labor, and establishing a logical sequence of tasks from demolition to finishing touches.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Install Risers and Treads — How to Plan a Stair Remodel Budget and Sequence | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.