From Childproof Stair Banister · Step 4 of 6 · Video by Pauls Workshop

Showing 1:10–1:30 of the source video.
The installer re-attaches the safety gate to the lower mounts on both sides of the stairway. He then extends the gate panels to their full width, ensuring they span the entire opening correctly. Next, he marks the positions for the final upper wall mounts on the second side, drills pilot holes, and secures these mounts with screws using the cordless drill. This completes the primary attachment of the entire gate structure to the wall.
Goal: Fully secure the gate by attaching it to all wall mounts
This project provides a step-by-step guide on how to install a configurable plastic safety gate at the top of a steep carpeted stairway. The process involves marking and securely attaching wall mounts, assembling the gate panels, and finally securing the gate to these mounts to prevent access to the stairs.
Read the baby gate manufacturer's instructions carefully. Typically, this involves mounting brackets or posts to the wall and/or banister post at the top of the stairs. Ensure the mounting points are structurally sound. Use a level to ensure the hardware is installed straight. Mark the screw hole locations, drill pilot holes if necessary, and securely fasten the hardware.
This project involves securing a stair banister to prevent a child from passing through gaps and installing a baby gate at the top of the stairs to create a safe environment.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.