Assess Existing Stairs and Planning
From How to Install Treads on Stairs with a Mid-Stair Landing · Step 1 of 8 · Video by Project Junkeez

Showing 0:00–0:13 of the source video. Watch the full video with every moment.
What happens in this clip
Before commencing any structural work, it's crucial to thoroughly assess the existing stair structure. The video highlights that these stairs previously had carpet, which implies a need for meticulous cleaning of staples, tack strips, and adhesive residues. The goal is to prepare the sub-structure for new, solid wood treads and risers, which will eventually be stained. The existing treads may have a 'lip' that needs to be addressed for a flush finish with new components.
Goal: The video begins by showcasing the stairs in their pre-renovation state, emphasizing the significant preparation needed. The stairs previously had carpet, which has been removed, revealing existing wooden treads and risers, some of which are likely painted or previously finished.
About the full video
This video details the extensive preparation required for a stair renovation, focusing on structural modifications and surface readiness before any finishing work, such as applying oil-based stain. It covers removing existing carpet and its residue, modifying baluster heights, and reinforcing the structure for new posts and treads.
Step 1 of 8: Assess Existing Stair Treads
Before installing new treads, carefully examine each existing stair tread. Look for signs of wear, rot, or structural damage. Ensure all previous coverings, such as carpet or linoleum, have been completely removed. Check for loose treads or risers and address any stability issues before proceeding. This assessment helps in planning the installation and identifying any necessary repairs to the underlying stair structure.
Every video in How to Install Treads on Stairs with a Mid-Stair Landing
Step 1: Assess Existing Stair Treads
- 0:00–0:13 Assess Existing Stairs and Planning (this video)
- 0:01–0:04 Remove Stair Covering
- 0:00–0:56 Assess and Remove Old Stair Treads
Step 2: Measure and Template Treads
- 0:55–1:13 Measure and Mark Tread and Nosing
- 0:57–1:16 Measure Treads and Mark Laminate
- 0:29–0:45 Mark and Cut New Stair Treads
Step 3: Cut New Stair Treads
- 1:16–2:13 Measure and Cut New Stair Treads
- 4:34–5:55 Measure and Cut Treads
- 2:07–2:42 Mark and Cut Your Treads
Step 4: Prepare Tread Surfaces
- 0:51–0:57 Strip Old Finish from Tread Surfaces
- 2:06–2:59 Sand Solid Oak Treads
- 0:33–0:39 Cut & Sand New Treads
Step 5: Test Fit New Treads
- 2:13–2:35 Test Fit and Adjust Treads
- 1:35–1:41 Dry Fit Tread and Nosing
- 19:07–19:52 Dry-Fit and Test Treads
Step 6: Apply Adhesive and Fasten Treads
- 2:32–3:28 Install First Tread and Riser
- 1:24–1:35 Apply Adhesive and Install Treads
- 9:53 Install New Treads
Step 7: Install Risers (if applicable)
- 1:24–2:00 Install Risers
- 0:04–0:08 Measure, Cut, and Install New Risers
- 3:28–6:52 Install Remaining Treads and Risers
Step 8: Fill Screw Holes and Finish
- 4:25–4:47 Fill Gaps and Nail Holes
- 5:31–6:06 Apply Finish & Clean Up
- 1:28–1:50 Clean Up and Finish
How to Install Treads on Stairs with a Mid-Stair Landing
This project outlines the process of installing treads on stairs that include a mid-stair landing. It covers preparation, measurement, cutting, and fastening of new treads to ensure a safe and aesthetically pleasing staircase.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

