
Clip 1/3
Helpful?
Step 5 · Repeat for Remaining Treads
Move to the next stair tread and repeat steps 2, 3, and 4. Ensure consistent spacing and alignment between each carpet tread and the previous one. Continue this process until all stair treads have a carpet tread installed.
Tools and Materials
Measuring Tape
Chalk Line
DURAL Squareline Profile 7/16 in. Square Edge Brushed Stainless Steel Metal Tile Edge Trim
Pencil
POWERTEC 1-1/2 in. x 3 in. Long Handle J-Roller with Rubber Roller 71010
You've reached the last step
Nice work — share this guide or find your next project.

