We Saved Mat Armstrong Dog !! By Installing A Glass Balustrade
Video by The Home Improvements Channel UK · 1 moment used in Oak Valley Designs's DIY guides · 13:56 long

Moments in this video
- 10:44–13:22 Install Glass Panels
From How to Install a Glass Panel Stair Railing, Step 4: Install Glass Panels
Identify each glass panel by its label and reference the CAD drawing to determine its correct placement. Carefully lift each glass panel and place it into its designated track section, sliding it into the installed clips and gaskets. The panels are sturdy enough at this stage to stand independently. Use the specialized tool (provided in the kit) to adjust the tilt of each panel, ensuring a consistent and straight line across the entire balustrade. Finally, use a hammer to tap in any remaining clips to fully secure the glass into position, locking everything into place.
The guide that use this video
Transcript
0:02 I'm that Armstrong but more importantly this is Kevin and this is a super low wall on a very high balcony and to make this a lot safer for Kevin we're installing a glass ballustrade from made to measure so before we do anything we need to unload the van and get all of the glass and the tracks stacked up ready to go so we've managed to get all the glass off the van safely without breaking it but now we need to get it up there so once we had got all of our materials up onto the balcony it was time to start marking out for our BAS tracks so I made some marks using the cad drawing supplied by mat measure and then me and Matt used a chalk line to Mark out exactly where they're going to go so Matt had never used one of these before
0:48 so little learning curve for him little dwang and it's as easy as that nice red line all the way round ready for the next step and now we've marked everything out it's time to start installing our base tracks including the preassembled Corners so because me and mat chalked out we knew exactly where to place everything so we place our Corners where they need to go and then we move on to the full length of track there's going to be some cuts on this so we're leaving them till after we're just getting all of the full pieces in position so when we're joining any bits together they Supply these pins there's three in each join they they literally get tapped in and then you can slide the two pieces
1:33 together and you haven't got to worry about any sort of alignment 65 mil 65 65 65 to right so that's our full pieces and our Corners into position so now you can see why it's super important to run these chalk lines cuz we know exactly where to put our pieces and that allows us to measure for our cut so we're going to take these full lengths and cut them down into the three pieces that we need me and Brad then went around with our tape measure and checked all of the spaces and made a note of the cuts that we needed to make making sure to measure twice and cut once because we don't want any short pieces of track not at this
2:20 stage we decided the best way to cut this was actually using a chop saw this is a wood bit but because aluminium is so soft they go through nice and easy and leave a super clean cut and we then put all of our cuts into position we've got every single one cut and in position now it's time to fix them down and we're going to fix them down using bolts so if you come here and have a look there's holes in the track and we're actually going to drill these out using M12 bolts M12 drw bit not a bolt the Bolt's going in after 4 mil as well so you mess that up as well oh scratch that Phil just told me off it's we're drilling it with a 40 mil drill
3:06 bit cuz we're using M12 volts using resin was that right Phil yeah well really good to Mark these we're using a Sharpie but it's not the best idea it's a bit awkward what I'd recommend is either a marksman which is the little paint pen but we couldn't get one today or I've just had the idea of using some line paint and just blasting above and that will show you the hole below I'm just going to carry on with this though like an awkward man right that's all of our holes marked out so now we're going to put our tracks on the floor in front of our wall and start drilling all of our holes hey yep remember Bend with your back not with your knees or is it Bend with your knees not with your back you never
3:56 know we carried on taking the track off of the wall being careful not to break anything or scratch anything so we placed it carefully in front of the wall and it was time to start drilling our holes so there was about 60 holes for this obviously it needs to be super secure and another thing to note these are engineering bricks so if you just push an SDS drill through there's a higher chance they might break so we used a diamond bit to break through the top of the brick and then we run our SDS through and out of all of the 65 holes we managed to break absolutely zero brick so a very good idea we come up with there so I'm just going to let you watch us drill these holes and I'll see you in a bit [Music]
5:03 me and Phil are getting through these holes but look at that dark sky Phil I I want to look at it look at the sun this is just typical English weather we've got lovely Sun but a storm like 20 seconds away so me and going to plow through these and we're see in a bit we've been drilling these holes for so long feels aged about 20 years look at his beard that's all of our holes drilled but for a little bit extra fixing we're going to be using some ct1 underneath our tracks so we're just going to run a bead all the way around in between our holes and then we'll get ready to put our tracks back on the
5:50 wall the reason we like using the ct1 as a little additional fixing is one it just it's a little backup and two with our weather as you can see it will set in water water so it doesn't matter that it's raining this stuff will still go off so while we're assembling our tracks for the last time and putting them in position for the last time we are also installing any pins that we haven't put in yet and then making sure everything is completely flush just give it a nudge towards me keep going keep going keep going keep going oh how's that Philly it's really good [Music]
6:51 right that's all our tracks in position off camera I've just packed a couple of low spots there's not really too many on this cuz it's very good wall and now it's time to install our bolts so these are 220 mil the reason they're so long is we wanted as much purchase inside this wall to make sure that this ballustrade is never going to be falling over so something you haven't seen us do is we've brushed out the holes and then also hoovered all of them the holes must be super clean for the resin to get a proper fix in so I've going through filling the holes with resin and then Brad's following with the bolts pushing them down and making sure they're nice and
7:39 flat right our resin is set so before we tighten up our bolts we're just going to pull all the protective film off just why we got a bit of spare time we then go around and just Nick all of our bolts up it doesn't take a lot probably about a quarter of a turn because they're obviously already flush with the track making sure that they're all nice and tight and secure so that is it all bolted down now is time to install the glass and our first step is to install these plastic Clips right and all you need to do to install these is just push them into the gaps they fit all nice and snug and these plastic Clips actually come with instructions to tell you how to space the glass so now it's time to install
8:26 the gasket and it's just a simple case of just pushing it into this little back what would you call that fil lip back lip I found it easier when you sort of like bend that bit and then push it and then keep going like that that seems to be the the technique with this rubber gasket not really sure how to feel about I hope prob going to get copyright cuz my singing so good no no we'll get this Matt you go driving around having a good time now it's time for the exciting part we're going to start installing the glass so when we're putting our glass in to know what piece goes where if you
9:13 look on the labels that's on every single piece it'll actually say the size so this is a 1089 for instance and then we'll go back to the cad drains that Mata measure sent us and then we know where they all go let's pop the paines in let's pop the paines oh that sounds like let's pop the let's pop the pains in let's pop the red things [Music] off me and Brad then went around and placed all of the pains into position always referring back to that CAD drawing so even though we haven't got all of our clips into position the glass is plenty sturdy at this stage you can slide it into that first clip and you haven't got to worry about it falling over and breaking so take your time when
9:59 you doing this obviously it is glass and I'll see you in a [Music] second make sure your glass is nice and slippery when you're installing it covered in water [Music] [Applause] [Music]
10:46 so all of our glass is in position and we've adjusted the spaces so on the cad drawer and again it sets all your gaps for your glass so now that they're in position we could use the second clip which is this one here and then we face this part towards the glass and we have one on the ends and then we also have them in between our clips that we've put down the previous clips and then what we do is we actually just push these down flush like that just put a little bit of tension on the glass and now that they're there we can actually adjust the tilt of the glass so that these are all in Al line so if you come over here now so we're going to do that all the way around and then using this little tool that's supplied the
11:32 first clip that you put in there's a little tiny slot and what that allows us to do is actually tilt the glass backwards and forwards so we're going to go around and install all of our clips and then we'll adjust that little tiny bit of adjustment that we need to we then go around putting the rest of our Clips in remember we're not putting them all the way down to the B bottom of the Trap just to the top so that it's put a little bit of tension on that glass so we can then adjust the tilt on each individual pane basically what we was aiming for is a nice consistent straight line no little bits that are stepping out and looking a bit odd and
12:18 once we had done that it was then time to send those clips all the way in so this tool is also supplied in the kit you sit the tool on top of the clip and then you can smack it with a hammer until it hits the bottom of the track you then go back to the first tool that we used and that goes in between the clip so there's like a little Gap and we tap the second part of that clip all the way down locking everything into position right now that's all done we can get our second piece of gasket in so this is the bigger of the two and then
13:04 all we do with this is we just push it into the top like this and we're just going to work our way around pushing this in so we'll get all this in I'll see you in a [Music] second right that's it the ballast rate is complete Kev will now be very safe on the balcony I hope you've enjoyed this video just remember to subscribe love you bye where's he go
Automatically transcribed from the source video.
More from the Oak Valley Designs DIY Hub
Read the guide Browse all guides
Planning this project? Shop Oak Valley Designs.