Replace Balusters On A Deck Or Porch Railing
Video by Enduring Charm LLC · 1 moment used in Oak Valley Designs's DIY guides · 9:15 long

Moments in this video
- 8:57–9:08 Prime and Paint Railing
From How to Fix a Wobbly Outdoor Stair Railing, Step 5: Test Stability and Finish
After all new balusters are installed and secured, the final step is to prime and paint the entire railing, including the new balusters. This ensures a consistent finish and adds another layer of protection to the wood. The narrator recommends using two coats of a quality exterior paint, such as Benjamin Moore, for durability and aesthetic appeal.
The guide that use this video
More from the Oak Valley Designs DIY Hub
Read the guide Browse all guides
Planning this project? Shop Oak Valley Designs.

