powered by

How to Layout Stair Stringers in Sketchup - Tutorial and Drawing Shortcuts

Video by Insider Carpentry - Spencer Lewis · 1 moment used in Oak Valley Designs's DIY guides · 31:02 long

Moments in this video

  1. 22:56–30:46 Add Dimensions and Export Drawing From How to Measure Stairs That Are Different Widths, Step 8: Document All Measurements

    The final step is to add dimensions to the drawing, making it usable for framers. Use the 'Dimension' tool ('D' shortcut) to add relevant measurements. Start by dimensioning the rough floor-to-floor heights. Then, add dimensions for the landing depth and the total run of each stringer section. Crucially, also add dimensions for the individual riser heights and tread depths, ensuring they are consistent throughout. Highlight the horizontal and vertical distances from a fixed point (like the wall) to the rough framing edges of the landing and stringers. This provides all necessary information for the framers to build the staircase accurately and to code. Once dimensioned, the drawing can be exported as a PDF or image for sharing.

The guide that use this video

Transcript

0:02 hey what's up guys in this video i'm going to show you how to model uh two u-shaped staircases in google sketchup so that you can figure your rise run and landing height so as you can see here on the side of my screen i've got a couple pictures with measurements annotated on it this is the staircase we're going to be building later on but right now i need to make i need to give the framers measurements so that they can frame in the landing height and then we can put our temp stairs in so let's start over here in sketchup i just opened up the program first thing i want to do since i'm going to be drawing in 2d go to your camera menu and click on parallel projection and

0:48 then select this house here look at it head on click that button now we're all set up to draw in 2d you'll notice on the side of my screen here i've got these little things that appear as i click different things that's so you can see what buttons i'm hitting and follow what shortcuts i'm using on the keyboard and i'll try and talk about it too as i go so let's start in the basement as you can see in my picture here i've got basement floor to floor height of 120 and three quarters of an inch i'll hit l for a line go up 120 .75 and then i'm going to come

1:34 over as you can see here my width is and a quarter so i'm going to come over 149.25 by the way i took these measurements and annotated using the notability app on my ipad pro in case everybody's wondering so this represents this rectangle now represents my floor to floor height from the basement to first floor now let's look at our next picture and do the second floor i'm going to go line i'm going to come up over here on my picture you can see i've got 136 from my floor to floor height from the first floor to the second floor 136 type that in

2:21 and then we'll come over and connect this so now these lines here represent my floor to floor heights from basement to first floor first floor to second floor now here is the tricky part we also need to figure our finished flooring into this equation so i know on my second floor i'm gonna have carpet so i'm gonna select this top line m for move control for copy and i'm going to figure three quarters of an inch for carpet and i'm going to move that line up now here for the first floor i know i'm going to have engineered hardwood which is 5 8 of an inch thick so i'm going to move this line up 5 8 and in the basement i'm going to have

3:06 carpet m control move that up three quarters of an inch so now i can use these lines to represent my finished floor to floor height the reason that's important is for me to equally divide up all of my rises i need to know what the true floor to floor finished height is to know my total rise so i'm drawing this in just so you can visualize this red strip represents my finished flooring so i'm going to draw a couple of lines over here that will represent

4:00 floor to floor finished height and we will redraw this stairwell with our new floor to floor height lines so let's just bring this back over select our width again of 149.25 and this will all make sense hopefully as we get to the end so now this is what i actually need to equally divide up my rises so let's start right here i'm just going to go ahead and erase these center lines to separate this a little bit sketchup has a wonderful function

4:46 where you can divide a line into segments and it will tell you exactly how many segments and what length they will be so i'm going to select the line for my rise my total rise come here to the right click on it click divide and as i move my mouse up and down it's going to give me a different amount of segments so here i have 18 19 segments with a length of 7 and 11 64. that's what i want so i'm gonna left click and now this line is broken up into a bunch of little seven and change in segments so let's start drawing our stringer out

5:31 i know i want 10 and a quarter run 10.25 the reason i know that is because my finished treads are going to be 11 and a half inches and that will give me an inch and a quarter overhang so there's my first tread line now we'll come down vertically again and i will lock my vertical axis by selecting my up arrow and i'll find this green dot which represents this next segment because again this line on the side here is broken up into all these tiny little segments now see here again when i select a line you can come

6:17 over here to the entity info area and it says 11 64. select the next rise 11 64. these are all the same so select that rise m control select that top corner i'm going to move uh oh that's not what i wanted to do i want to do the tread first m for move control for copy move that one down now here's the great thing about sketchup hit shift 8 which is your asterisk and then you type in the number of times that you want it to copy that so i'm just going to go ahead and hit 10 then enter

7:02 and you can see it made the exact same movement of that line 10 times now we'll do the same thing with the rise m for move control for copy select that top corner move it down shift 8 for asterisk and now again hit 10 enter and it makes the same movement 10 times now i know this is a u-shaped staircase and i know i want 10 rises on this first section so i'm going to count this out 1 2 3 4 5 6 7 8 9 10. e for erase and we're going to get rid of these

7:49 we'll finish drawing this stringer i'll bring this line over now connect a line from the nose to nose hit l again for line and i want to create a perpendicular line to this nose to nose line that i just drew so i'm going to come to the center l for line click see that pink line that means i'm perpendicular i'm going to just go with 11 inches now l for line draw a line here and it'll give you the option to have that pink line again which is going to run perpendicular it's a little tricky getting that perpendicular line to pop up sometimes

8:37 sometimes you have to help the program figure out where you're trying to orient but i won't go too far in depth on that now e for eraser we'll clean this up now we've got a stringer yay for that okay select the face double click hit g for component and we're gonna turn this into a component call it uh second floor top stringer enter now that's a component that means i can't select any individual line on this unless i double click into it and it separates this stringer

9:22 from everything else around it now let's draw the landing in l for line we'll just select the bottom edge of this stringer here go with 12 inches bring it over up and there we go now we've got our landing drawn in now we need to continue this next stringer down so there's a couple ways you could do this i'm gonna for demonstration purposes on this first one let's select this component m for move control for copy and let's move this down i'm going to hit the up arrow to

10:09 lock it on the vertical axis and i'm going to find that next segment point right there for my rise hit s for scale and we're gonna flip this 180 degrees so i hit s for scale select this arrow over here type in negative one and that is going to flip it 180 degrees and we'll move it back over here and let's just hit l for line and double check to make sure this rise is exactly what it should be 7 and 11 64. so you can see that here in this bottom left-hand window

10:55 okay so we're where we need to be height wise we can also double check by coming down to the bottom here and as you can see this riser lands directly on the line with my finished floor so we do have one less rise and tread on this stringer so i need to erase that so i'll double click to get into that component l for line draw a line across the bottom here even with my finished floor e for eraser and we'll clean that up uh oh i screwed up i forgot to make this component unique and as you can see my actions here erasing these pieces

11:41 did the same thing up here so i'm gonna hit control z z z go back a little bit now i'm gonna select this again right click make unique we want to make this component unique so that our changes on this component do not carry over to this other top stringer here now that we've made this unique we'll do the same thing e for erase clean that up and now as you can see it did not erase my bottom step on the other one okay so now our first floor stringers are laid out let's do the same thing

12:26 for the basement stair you can see this is a whole line right here floor to floor height i need to right click select the divide option and by moving up or down it's going to give me different options for number of segments i know i want 18 rises so i'm going to get that on 18 left click and now that line is broken up into a bunch of pieces that are all divided up into 18 equal pieces line find that first segment over 10.25 for my tread i'm going to hit the up arrow to lock this in the vertical axis and i'm going to find that

13:13 green dot which represents the end of that next segment boom select my tread m for move control for copy get that green dot which tells you that you are on the end of the line move it to the bottom of that rise shift 8 for the asterisk hit 10 now we've repeated that action 10 times let's do the same thing for the rise m for move control for copy move it down shift 8 for asterisk 10 and i believe on this unit i want 10 rises also wait yes so i'm going to count that

13:59 out 1 2 3 4 5 6 7 8 9 10 e for erase get rid of those we will bring this line over connect the nose to nose which will give you a line that follows the angle of the staircase that light blue dot represents the midpoint l for line pink line tells you that you are perpendicular to that line you just selected type in 11 inches now again draw a line over the top of this line that tells sketchup the program where you're trying to

14:47 orient things now select that point and it'll give you that pink line option to draw a line perpendicular e for eraser clean it up select the face double click selects all the bounding edges hit g for component and we'll call this basement stringer top

15:32 now let's draw a landing again come to the bottom here let's come down 12 inches over up there we go now we've got our landing drawn in now this time let's rather than copying and scaling and doing all that we'll just do it the old-fashioned way and draw this one in again so i came over here i found my next green dot which represents my rises hopefully you get the picture by now we'll just bring a line all the way over from our landing will come over 10.25

16:22 and we'll come down hit the up arrow to lock in the vertical axis again i'll come over here find my green dot for the next segment so now my rise is drawn in there select my line for my tread m for move control for copy get that green dot for the end point move it down shift 8 for asterisk and let's type in 8 enter we got 10 treads there do the same thing for the rise m for move control for copy move it down shift 8 for asterisk hit in 8 enter that repeats the action eight times

17:12 and again we'll connect the nose to nose and then get a perpendicular line here 11 inches see here how it's not giving me my pink line whenever i'm trying to follow the angle of the stair that's because the program doesn't know what i'm trying to do so if i come back over here and i'm not getting that pink line draw the line again right here and now doing that see how that pink line popped up then it's because i told the program what i was trying to do now it disappeared again so it's a little bit tricky but drawing that line tells the program what you're trying to

17:58 do now i need to draw a vertical line here that we'll clean it up with the eraser now select the face double click selects bounding edges g for component and basement stringer bottom okay so now we have our stringers drawn in with the exact rise that we need for the finish floor to finish floor

18:46 height so now here's where things get a little bit tricky i have my landings drawn in here but this top line of my landing actually represents my finished floor height so i need to tell the framer where the rough floor height needs to be framed in so what i'm going to do is i'm going to go ahead and select these landings i'm going to double click and i'm going to hit g to turn them into a component and i'm going to call this first floor landing we'll come down here to the basement call this second what am i doing

19:33 g second floor landing technically these should be the same so let's come back up here and we'll edit this first floor landing now so this landing is going to get 5 8 engineered hardwood installed on it so i'm going to hit m for move control for copy bring down that line 5 8 of an inch now this is going to represent my engineered hardwood flooring i also need to draw

20:18 in my three quarter inch osb subfloor so let's m for move control for copy we'll move this line down also 0.75 inches and we'll color that also so whenever i tell the framer the finished height of the landing for his framing it needs to be to the top of this point right here so you can see it was important to to note that because if i would have had him frame it to where the bottom of this stringer is drawn in right now it would have been off 5 8 of

21:04 an inch so let's come down here to the basement do the same thing select that top line m for move control for copy move it down 5 8 m for move control for copy move that down 0.75 now if you thought we were done you're wrong we're not done yet if you've ever framed a stair you know that there's an extremely important step that i haven't done yet and that is account for the tread thickness this is really really important obviously otherwise your staircase will be way off on this staircase i'm going to be applying a three-quarter inch

21:49 riser and a one-inch thick tread so let's go ahead and draw that on now i am going to go ahead and put my risers in first so i'm going to draw this in let's go to the top one i'm going to come over three quarters of an inch we'll select that dot come up now this represents our risers g for component i'm just going to type in riser

22:35 second floor these will all be the same height for the most part m for move uh what point do i want to select i'm going to select this bottom corner here we want to repeat this 10 times ish shift 8 10 so now you can see now we have risers going all the way across here and i got one extra down here which i'll just delete now i want to draw in my treads my treads will be one inch thick

23:22 one l for line they're going to be 11.5 inches and as you can see that will give me an inch and a quarter of nosing which you can see down here in this bottom corner it says length and then it's got this window that's where it tells you your selected measurement inch and a quarter so select the face double click g for component second floor treads i guess all these treads will actually be exactly the same m for move control for copy

24:18 shift eight for asterisk hit the nine okay now you can see what happened here as i hit that repeat nine you can see that it put my tread right here now why is that that is because i haven't accounted for the thickness of my tread by cutting off the bottom of the stringer which is very important so what happens is if you don't account for the thickness of your tread whenever you're framing a stair

25:04 you'll end up with your first step being way too big and your last step will be way too small so as you can see as it is right now if i hit the d for dimension my total step height would be over eight inches right here and if i come up to the very top my step height is only a little over six inches that's because i haven't dropped the entire thing one inch to account for the thickness of the tread so what we're going to do is i'm going to delete that and then i'm going to select

25:52 all of this stuff and i'm going to turn it into one component or group then we can move it all down at the same time

26:47 there everything is selected now i'm going to hit m for move i'm going to move everything down one inch for some reason it didn't select that very top tread so i will move that down also so now you'll notice what happened now my finished floor height that's a let 7 and 11 64. and if i come up here to the top my finished step height is 7 and 11 64.

27:33 that's extremely important that we have the reason we're taking all this flooring into account is so that as we step from our landing to our first step and from our last step up on to the finished floor carpet we have the same rise on all those steps it's really important now one detail that you will see here that i need to change now that we've gotten to this point is i want my framing stringer to actually sit down on the finished framing so i can adjust

28:30 the height of my stringer right here so that it will sit on top of that osb same thing for this riser i do need to right click make unique and then i can move this up also all right there we go so we've got the same thing there i'll go ahead and finish out this

29:35 our top step from the finish floor is 7 and 11 64. and i will draw a line across here from the top of the engineered flooring and bring that down to the top of the tread here d for dimension and we've also got 7 and 11 64. so this is how you properly lay out a staircase so that you have all of the same steps and it's comfortable going the whole way up as well as so you meet code because if you have too much variation between any of your steps they might not pass your staircase so i'm going to finish this bottom up

30:22 here and then i can dimension out these um landings and get that information to the framer so that he can frame it anywho you get the idea i'll figure that out but uh now i can save that as a pdf and i can send it to somebody or whatever relay that information to the framer and these will he will build temp stairs in here and then we're going to build housed stairs units later on but for now we know that we can get these landings in the correct spot

Automatically transcribed from the source video.

More from the Oak Valley Designs DIY Hub

Read the guide Browse all guides

Planning this project? Shop Oak Valley Designs.

How to Layout Stair Stringers in Sketchup - Tutorial and Drawing Shortcuts — step-by-step moments | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.