How to Install a Newel Post using the KeyLock Newel Post Fastener
Video by Fastener Unlimited Inc · 1 moment used in Oak Valley Designs's DIY guides · 9:14 long

Moments in this video
- 5:05–6:13 Prepare Newel Post
From How to Install a New Newel Post, Step 2: Prepare Post Base for Attachment
Ensure the newel post has been cut to the desired final length. If the floor surface is un-level, cut the base of the newel post at an angle using a saw to ensure it sits plumb. Use a speed square and pencil to mark the exact center of the newel post's base. With a cordless drill and the appropriate drill bit (5/16" for hardwoods, 1/4" for softwood), drill a pilot hole 4 inches deep into the marked center of the newel post base. Apply wax to the threads of the 3/8" x 5" hex lag bolt. Using a 9/16" wrench, thread the waxed lag bolt into the pilot hole in the newel post. Continue threading until the lag bolt head is positioned within 1/2 inch of the post's surface.
The guide that use this video
Transcript
0:09 my name is Todd I'm going to show you how to install a nle post using the keylock new post Fastener the Fastener is fully concealed when installed it can be used on finished floor surfaces stairs ceramic tile and [Music] concrete determine the new post
0:56 location make sure there's adequate backing under the post base set the key lock plate in the center of the
2:05 Inlet the plate 1116 of an inch below the finished surface you can use a spade bit in a chisel or you can use a router Mark the spade bit for the thickness of the plate which is 38 of an inch plus a 16th of an inch for proper depth drill out as much wood as you can with the spade bit
3:26 [Music] rouer check to make sure that the plate fits and it's below the finished surface Mark the keyhole slot area use the spade bit or the router to make the keyhole area 38 of an inch deep and wide enough for the leg bolt
4:13 check to make sure the head of the leg bolt slides
5:07 after the post has been cut to the desired length Plum the post to make sure that the surface is level Mark the center on the bottom of the post drill the pilot hole for the 3/8 bolt 4 in
5:59 threads use a 9/16 inch wrench to thread the leg bolt in stop within a half inch of the leg bolt head insert the leg bolt head into the key lock plate if the post is too loose tighten the leg it's a little too tight we're going to loosen it up a little
6:48 bit use a block of wood to protect the post and drive the base of the new post towards the opposite end as the leg bu head slides down the tapered slot the post and the floor will draw tightly together creating a strong
9:04 the key loock Fastener meets the two main requirements for a Stairway to look good and be strong thank you for
Automatically transcribed from the source video.
More from the Oak Valley Designs DIY Hub
Read the guide Browse all guides
Planning this project? Shop Oak Valley Designs.

