powered by

Front Entrance Makeover Time Lapse

Video by I Am a Hardscaper · 1 moment used in Oak Valley Designs's DIY guides · 7:52 long

Moments in this video

  1. 4:05–4:23 Install Edging and Backfill From How to Level a Sinking Paver Step, Step 4: Backfill and Compact Edges

    Install plastic or metal edge restraint along the outer perimeter of the laid pavers that are not against a fixed structure. Use spikes to secure the edging firmly into the subgrade. Mix a small batch of concrete or use a dry-mix mortar to create a stable backfill along the base of the precast steps and behind any edge restraints. Use a trowel to apply the concrete/mortar, forming a strong, permanent bond that locks the steps and pavers in place.

The guide that use this video

More from the Oak Valley Designs DIY Hub

Read the guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Front Entrance Makeover Time Lapse — step-by-step moments | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.