powered by

Building steps into a hill.

Video by Brantley Blended · 1 moment used in Oak Valley Designs's DIY guides · 9:41 long

Moments in this video

  1. 7:25–9:32 Backfill, Finalize, and Cure From Landscape Steps, Step 8: Final Grading and Drainage

    After all the steps are built, use a shovel and your hands to carefully distribute the remaining gravel and excavated soil around the sides of the newly constructed steps. This helps to fill in gaps, provide additional stability, and create a smooth transition between the steps and the surrounding hillside. Compact the gravel and soil around the steps with a hand tamper to ensure everything is settled. The creator then walks up and down the completed steps to test their stability. He notes that the adhesive typically requires about seven days to fully cure before the steps can be considered completely solid.

The guide that use this video

More from the Oak Valley Designs DIY Hub

Read the guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Building steps into a hill. — step-by-step moments | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.