powered by

Install Formwork for First Step

From How to Add a Step at a Too-High Back Door · Step 4 of 10 · Video by Bathroom Remodeling Teacher

Showing 0:56–1:21 of the source video. Watch the full video with every moment.

What happens in this clip

To form the new step, cut and install wooden form boards. The presenter uses a circular saw to cut the boards to the correct length and then secures them to the existing concrete. This is done by first drilling pilot holes into the concrete using a hammer drill, then fastening the wood formwork in place with Tapcon screws. The formwork should be level and securely fastened to create the desired shape for the new step's riser and tread edge. For the first step, two boards are used: one for the front edge and another for the side to create a corner.

Goal: Create a secure wooden form to shape the first new concrete step.

What's used

Tools

  • Circular Saw
  • Miter saw
  • Hammer Drill Milwaukee
  • Impact Driver Milwaukee
  • Level
  • Pencil
  • Tape Measure

Materials

  • Masonry Drill Bit
  • Tapcon Screws Tapcon
  • Concrete nails (with powder-actuated tool)
  • Wooden Boards (e.g.
  • 2x4s)
  • Metal forms

About the full video

This project provides a detailed guide on how to repair severely damaged concrete steps using a patch mix. It covers the preparation of the existing steps, setting up temporary forms, applying bonding agents, mixing and pouring concrete patch mix, and finishing the steps for a restored and safe appearance. The process is broken down into manageable sections, often addressing one step at a time.

What's said in this clip

one step a day. So I'm just going to put a bunch of tap cons in the front face of this. We're going to go ahead and use some adhesive. This is a bonding agent. Get this in the place.

Automatically transcribed from the source video.

Step 4 of 10: Construct Step Formwork (if using concrete)

If pouring a concrete step, construct a sturdy wooden form using 2x lumber (e.g., 2x8 or 2x10 depending on desired step height). The inside dimensions of the form should match the desired dimensions of the step. Secure the formwork to the ground using stakes and ensure it is level and plumb. The form should contain the wet concrete and provide the desired shape for the riser and tread.

Open this step in the guide

Every video in How to Add a Step at a Too-High Back Door

  1. Step 1: Determine Step Location and Dimensions

  2. Step 2: Excavate for Step Foundation

  3. Step 3: Install Gravel Base and Compact

  4. Step 4: Construct Step Formwork (if using concrete)

  5. Step 5: Pour and Finish Concrete Step

  6. Step 6: Build Wooden Step Frame

  7. Step 7: Install Step Frame and Ensure Stability

  8. Step 8: Attach Step Treads and Risers

  9. Step 9: Install Railings (if required or desired)

  10. Step 10: Backfill and Landscape Around Step

Questions about How to Add a Step at a Too-High Back Door

What are the most crucial safety precautions I should take when building an exterior step?

Always call 811 before digging to avoid underground utilities. When working with concrete, wear gloves and eye protection to prevent skin irritation and splashes. Ensure your work area is stable and clear of obstacles to prevent falls, especially during excavation and concrete pouring.

What are the main differences between building a concrete step versus a wooden step, and which is better?

Concrete steps offer superior durability, weather resistance, and require less maintenance over time, making them ideal for a permanent solution. Wooden steps can be quicker to build and more aesthetically versatile, but they require more frequent maintenance (sealing, staining) and are more susceptible to rot and insect damage. The 'better' choice depends on your budget, desired longevity, and maintenance commitment.

Is the '2 days' estimated time realistic for a beginner, or should I plan for more time?

The '2 days' estimate is achievable for someone with basic DIY experience and good planning. However, as a beginner, it's wise to allocate additional time, especially for thorough foundation preparation, ensuring precise measurements, and allowing for concrete curing if you choose that material. Weather can also impact the project timeline significantly.

What are common mistakes beginners make when building an outdoor step, and how can I avoid them?

A common mistake is inadequate foundation preparation; ensure the gravel base is thoroughly compacted to prevent future settling and cracking. Another is incorrect step dimensions (rise and run), which can make the step uncomfortable or unsafe; always double-check against local codes. Also, not allowing proper drainage around the step can lead to water damage over time.

Do I need to check with my local municipality or HOA before starting this step project?

Yes, it is highly recommended to check with your local building department and homeowner's association (HOA) before you begin. They can provide essential information on required permits, specific building codes for step dimensions, railing requirements, and setback rules. This ensures your project is compliant and avoids potential issues.

Are there any tools listed that I might be able to substitute or rent instead of buying new?

Many common tools like a measuring tape, level, and shovel you might already own. Specialized tools such as a concrete float, mattock, or even specific power tools for cutting lumber could potentially be rented from a local hardware store or borrowed from a friend. Always prioritize using the correct tool for safety and efficiency, whether owned or rented.

How to Add a Step at a Too-High Back Door

This project outlines the process of adding an exterior step to a back door that is too high off the ground, improving accessibility and safety.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Install Formwork for First Step — How to Add a Step at a Too-High Back Door | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.