How to Build Stone Steps in a Garden
Step 2 of 6

Clip 1/3
Helpful?
Step 2 · Install Drainage and Gravel Base
After excavating, add a layer of coarse gravel (e.g., 3/4-inch crushed stone) to the bottom of the excavated area, about 4-6 inches deep. This layer is crucial for proper drainage, preventing water from pooling under the steps and causing frost heave or erosion. Compact this gravel layer thoroughly using a tamper. Add a thinner layer (about 1-2 inches) of smaller gravel or coarse sand on top of the compacted coarse gravel.