powered by

Stencil A Cement Floor With A Tile Stencil by Cutting Edge Stencils

Video by CuttingEdgeStencils · 1 moment used in Oak Valley Designs's DIY guides · 2:17 long

Moments in this video

  1. 2:00–2:05 Apply Protective Finish From Stair Riser Painting, Step 6: Apply Protective Topcoat (Optional)

    After the entire stenciled floor is completely dry (allow at least 24-48 hours for the paint to cure), apply 2-3 coats of water-based polyurethane. This protective layer will seal the paint, protect the floor from wear and tear, and make it easier to clean. Use a clean paint roller or applicator specifically designed for polyurethane, following the manufacturer's instructions for application and drying times between coats.

The guide that use this video

More from the Oak Valley Designs DIY Hub

Read the guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Stencil A Cement Floor With A Tile Stencil by Cutting Edge Stencils — step-by-step moments | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.