powered by

Multi Angle Bracket Install

Video by Preferred Aluminum Railing · 1 moment used in Oak Valley Designs's DIY guides · 9:23 long

Moments in this video

  1. 1:54–2:34 Pre-drill Post Mount Holes From Cable Railing Installation, Step 2: Drill Post Mounting Holes

    Using a cordless drill equipped with a #2 square drive bit, carefully pre-drill the two marked holes for both the top and bottom post mounts. This step ensures that the self-tapping screws will go in smoothly and securely without splitting the material or causing damage to the post. After pre-drilling, erase any visible pencil marks on the post for a clean finish.

The guide that use this video

More from the Oak Valley Designs DIY Hub

Read the guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Multi Angle Bracket Install — step-by-step moments | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.