Flooring Stair Tread Installation Instruction - Mohawk RevWood
Video by Znet Flooring · 1 moment used in Oak Valley Designs's DIY guides · 1:59 long

Moments in this video
- 1:28–1:50 Clean Up and Finish
From How to Install Treads on Stairs with a Mid-Stair Landing, Step 8: Fill Screw Holes and Finish
Continue repeating the process of installing risers and treads, moving upwards until all stairs are completed. Once all components are installed, thoroughly clean the steps. Next, use color-coordinating nail putty to fill in all the nail holes on both the risers and treads, ensuring a smooth finish. Finally, fill the expansion gaps left on the sides of the treads with caulk (for white stairs) or clear silicone (for other colors). After all finishing steps, it is crucial to stay off the stairs for 24 to 48 hours to allow sufficient time for the glue and sealants to fully dry and cure.
The guide that use this video
More from the Oak Valley Designs DIY Hub
Read the guide Browse all guides
Planning this project? Shop Oak Valley Designs.

