powered by

Measure Total Rise and Floor Levelness

From How to Plan an L-Shaped Staircase Layout · Step 1 of 6 · Video by HouseImprovements

Showing 3:44–7:35 of the source video. Watch the full video with every moment.

What happens in this clip

The speaker demonstrates how to measure the total rise: the vertical distance from the finished floor of the lower level (e.g., concrete basement floor) to the top of the finished floor of the upper level. It's crucial to factor in the thickness of any finished flooring materials at both ends. For instance, if the main floor has hardwood (3/4 inch thick) and the basement has carpet (equal to hardwood in height), no deduction is needed. However, if the basement has thinner vinyl plank (1/4 inch thick), a 1/2 inch difference must be calculated. The speaker measures a total rise of 103 5/8 inches to the top of the subfloor, adding 3/8 inches for the future subflooring, for a true total rise of 104 inches. He also stresses the importance of checking that the floor where the stairs will land is level; if not, adjustments to the total rise measurement are necessary.

Goal: Accurately measure the total vertical distance (total rise) from the bottom finished floor level to the top finished floor level, accounting for any differences in flooring material thickness. Also, verify the levelness of the landing surface.

What's used

Tools

  • Spirit Level
  • Tape Measure

Materials

  • Flooring Materials

About the full video

This video provides a detailed guide on planning and dimensioning a staircase, focusing on understanding building codes, measuring key components like total rise, total run, headroom, and selecting appropriate materials. It covers essential terminology, calculation methods, and practical considerations for ensuring a safe and compliant staircase installation.

What's said in this clip

um now some of the things we need to know to figure out the whole layout is we need to know the total rise so that's right from the floor back here that's right from right down here on the floor up to the top of whatever your uh subfloor is going to be okay so that's your total rise now your flooring can come into play as well here um if you've got uh say hardwood up there which is extra 3/4 of an inch and carpet down here in the basement uh those two will probably end up working out pretty equal so you don't need to make any deductions for that but let's say you have hardwood up there and vinyl plank or laminate in the basement that's only a quart of an inch thick well you've got a half inch difference so you need to uh calculate what that difference will be so top of finished floor down here to top a finished floor up there okay in my case I'm going to have vinyl plank I'm going to have the same flooring in the basement as I am up there so my total distance uh from concrete to top of the underlay that's going to be under that flooring up there is going to be my total rise okay so I'm going to measure that maybe I'll take you with me see if we can get you a little closer okay so I'm going to drop my uh tape measure right down to the top of the concrete floor and I'm going to measure from basically underside of finished floor at the basement to underside of finished floor on the main floor okay so that means I'm going to have 38 of an inch more on top of this uh 3/4 inch plywood here because that'll be my subflooring under the under the flooring upstairs so I've got when I'm sitting there I've got 103 and 58 to the top of this plywood so when I add my 38 for my subflooring that's going to go under my floor my finished floor that'll give me 104 in total rise I'll just double check it on this side it should be the same yeah within a 16 an inch there okay so now I know my total rise is going to be 104 in okay um something you should always check as well is that the floor that you're going down to is level so the the height here if the floor isn't level at that end if the floor at the end where the stairs land is higher or lower than it is down here that's going to throw your measurement all out so just double check with the level that you're the same and if not just make an addition or or a subtraction at that end so if that end was higher than here by quarter inch then you need to take a quarter inch off your total rise because your total rise is really from…

Automatically transcribed from the source video.

Step 1 of 6: Measure Existing Floor Heights

Using a tape measure and a level, determine the exact vertical distance between the subfloor of the lower level and the subfloor of the upper level. Take multiple measurements at different points to account for any variations in floor height and average them to get the most accurate total rise. Ensure the measurements are taken plumb (perfectly vertical).

Open this step in the guide

Every video in How to Plan an L-Shaped Staircase Layout

  1. Step 1: Measure Existing Floor Heights

  2. Step 2: Determine the Total Run

  3. Step 3: Calculate Riser Height and Tread Depth

  4. Step 4: Design the Landing

  5. Step 5: Create a Detailed Layout Plan

  6. Step 6: Select Materials and Hardware

Questions about How to Plan an L-Shaped Staircase Layout

Is planning an L-shaped staircase truly a "beginner" DIY project, and what's the estimated time for just the planning phase?

While the conceptual planning, including initial measurements and basic calculations, is beginner-friendly and estimated at around 4 hours, understanding and correctly applying complex local building codes can be challenging. The real difficulty and time commitment come when you move from planning to the actual construction of the staircase, which requires precise execution and structural knowledge. Planning costs are minimal, mainly for tools like a construction calculator and measuring tape.

Why is it so crucial to focus on building codes during the planning phase for an L-shaped staircase?

Building codes are paramount because they dictate critical dimensions such as minimum tread depth, maximum riser height, landing sizes, and handrail requirements, all of which directly impact the safety and usability of your staircase. Failing to comply can lead to an unsafe staircase, difficulties passing inspections, and potential legal or resale issues. Always obtain and review your local building codes early in the planning process.

Do I really need a specialized construction calculator or a laser level just for planning the staircase layout?

While a standard measuring tape and calculator can help with basic measurements, a specialized construction calculator, like the Construction Master 5, greatly simplifies complex rise and run calculations, minimizing errors and saving time. A self-leveling laser level ensures your floor height measurements are precisely accurate, which is absolutely critical for a safe and code-compliant staircase design. These tools improve accuracy and efficiency during the planning stage.

What are common mistakes to avoid when planning an L-shaped staircase layout?

A common mistake is neglecting to account for adequate headroom clearance at all points, especially above the landing, or miscalculating the total rise or run, which can lead to non-code-compliant or uncomfortable stairs. Another frequent error is designing a landing that is too small or improperly dimensioned. Double-check all measurements and calculations, and always consult local building codes to ensure your design is safe, functional, and compliant before building.

What specific considerations are important when designing the landing for an L-shaped staircase?

The landing in an L-shaped staircase must meet minimum dimensions specified by local building codes, typically matching the width of the stairs and having a minimum depth. Ensure there is sufficient headroom above the landing itself, as this is a common area for clearance issues. The landing's structural support must also be carefully planned to safely bear the load from the staircase sections it connects.

What if my available space seems too small for a standard L-shaped staircase design?

If your space is tight, you might need to explore alternative designs like winder staircases, which use triangular treads instead of a flat landing to change direction. However, winder stairs often have more stringent code requirements and can be more complex to design and build safely. Always consult your local building codes regarding minimum tread depth, riser height, and any specific requirements for winder treads, and consider hiring a professional architect or engineer for space-constrained designs.

How to Plan an L-Shaped Staircase Layout

Develop a comprehensive plan for an L-shaped staircase, including initial measurements, rise and run calculations, landing design, and material considerations, ensuring compliance with building codes.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Measure Total Rise and Floor Levelness — How to Plan an L-Shaped Staircase Layout | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.