Apply New Mortar with Pointing Trowel
From How to Repair Loose Bricks on Front Steps · Step 4 of 6 · Video by This Old House

Showing 1:56–2:46 of the source video. Watch the full video with every moment.
What happens in this clip
Using a pointing trowel, scoop a manageable amount of mixed mortar and carefully apply it to the cleaned joints. The technique demonstrated involves sliding the mortar off the trowel and pushing it firmly into the joint. Ensure the mortar completely fills the void, packing it down tightly to prevent air pockets and ensure good adhesion. Work methodically along each joint. If working on a hot, sunny day, dampen the bricks slightly before application to prevent them from drawing too much water out of the mortar prematurely, which can lead to cracking.
Goal: Fill all prepared joints completely and neatly with new mortar.
What's used
Tools
- Brick Trowel
- Pointing Trowel
Materials
- Mixed Mortar
About the full video
This video provides a detailed guide on how to repair and repoint mortar joints on brick steps, emphasizing precision and efficiency. It covers various methods for removing old, deteriorated mortar, mixing new mortar to the correct consistency, expertly applying it using a pointing trowel, and then tooling the joints for a professional, watertight finish. The instructions also include important considerations for working conditions and post-repair cleaning.
What's said in this clip
worry about the sun and the brick being so hot and dry that it would actually steal some of the water out of the mortar causing it to crack but we're in the shade here so we're all right that's right so the tent was for the bricks not for us well it was for me too but you're right it was for the brick now what i'm doing is i'm sliding it off my trowel and i want to push it right down tight into each joint okay now i'm going to just take my trowel hold it under the tread like that push it right in with the tip working it right up there now when i'm installing the mortar into the brick joint i try to be as neat as possible i don't want to get the mortar all over the brick itself because it stains it
Automatically transcribed from the source video.
Step 4 of 6: Apply New Mortar
Using a small trowel or a pointing trowel, firmly pack the new mortar into the cleaned joints around the loose bricks. If a brick has become completely detached, pack mortar into the cavity on the step first, then press the brick firmly into place, ensuring it is flush with surrounding bricks. Add mortar to fill any remaining gaps.
Every video in How to Repair Loose Bricks on Front Steps
Step 1: Assess Loose Bricks
- 0:26–1:43 Inspect and Clear Damaged Areas
- 0:13–0:32 Assess Existing Steps and Plan Repair
- 0:11–1:25 Assess Damage and Remove Loose Material
Step 2: Clean Out Loose Mortar
- 3:37–4:10 Prepare Mortar Joints by Cleaning Out Loose Material
- 1:31–1:47 Remove Loose Mortar and Clean Joints
- 0:04–0:11 Clear Old Mortar
Step 3: Prepare New Mortar Mix
- 2:16–2:50 Mortar Mix Preparation
- 1:59–4:11 Mix Mortar to Correct Consistency
- 1:44–2:26 Prepare Mortar Mix
Step 4: Apply New Mortar
- 1:56–2:46 Apply New Mortar with Pointing Trowel (this video)
- 10:45–11:48 Point Up Brick Mortar Joints
- 4:11–5:35 Apply Mortar to Joints
Step 5: Tool the Mortar Joints
- 0:18–0:32 Tool the Mortar Joints
- 5:33–6:29 Tool and Finish Mortar Joints
- 6:30–10:14 Point and Finish Mortar Joints
Step 6: Cure the Mortar
- 6:57–8:15 Cure Mortar by Misting
- 4:09–4:44 Cure and Final Clean
- 0:10–0:14 Allow Base Mortar to Cure
Questions about How to Repair Loose Bricks on Front Steps
Beyond general tools, what specific masonry tools are essential for effectively repairing loose bricks on front steps?
You'll definitely need a masonry chisel and a tuck pointing trowel for removing old mortar and applying new. A wire brush is crucial for cleaning joints, and a sturdy bucket is indispensable for mixing mortar. These specialized tools ensure precise work and a durable repair.
What are the most important safety precautions I should take when working with mortar and old bricks?
Always wear eye protection to guard against debris and splashing mortar, and heavy-duty gloves to protect your skin from the alkaline nature of cement. A dust mask is highly recommended to avoid inhaling mortar dust, which can irritate respiratory passages. Ensure proper ventilation if working in an enclosed space.
Given the 'beginner' difficulty, what's a realistic time commitment for repairing a few loose bricks, and what factors might extend this?
For a beginner repairing a few loose bricks, expect the project to take approximately 8 hours, including cleaning, mixing, application, and initial curing. This time can extend significantly if there are many loose bricks, extensive old mortar removal is required, or if you opt to mix your own mortar from scratch instead of using a pre-mix.
The project mentions both bulk sand/cement and fast-set repair mortar. Which should I use, and what's the biggest challenge when mixing mortar as a beginner?
For smaller repair jobs or if you're new to masonry, a pre-mixed fast-set repair mortar (like Quikrete Fast Set Repair Mortar Mix) is often easier to work with, as it simplifies the mixing process. The biggest challenge for beginners when mixing mortar is achieving the correct, consistent workability – not too wet, not too dry – which is crucial for proper adhesion and strength.
What are some common mistakes beginners make when applying new mortar for brick steps, and how can I ensure good adhesion and a professional finish?
A common mistake is not thoroughly cleaning out the old mortar and dust, which prevents good adhesion. Another is using mortar that's too wet or too dry, leading to weak joints. Ensure your mortar has a peanut butter-like consistency, press it firmly into the joints, and tool it neatly for a professional look before it fully sets.
Why is the mortar curing process so important, and what steps should I take to ensure my newly repaired bricks last?
Proper curing allows the mortar to achieve its maximum strength and durability through a hydration process. Keep the newly applied mortar moist for at least 3-7 days by lightly misting it with water or covering it with plastic sheeting (like Aluf Plastics Plastic Sheeting). This prevents it from drying out too quickly and becoming brittle, ensuring a long-lasting repair.
How to Repair Loose Bricks on Front Steps
This project outlines the steps for repairing loose bricks on front steps, including assessment, cleaning, mortar preparation, application, and finishing.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.